Building LCA framework for the UK, the EU and SwedenSweden, the EU and the UKthe EU, Sweden and the UK
How we represent building LCA across UK, Swedish and EU rules: what each standard and regulation requires, where they differ, and the choices our data model makes so that one assessment can be reported under several methods. It covers all building types, with the UK first, then Sweden, and the EU in parallel.
This is our framework document, shared with practitioners for review. Tell us where it is wrong, incomplete or unclear with Give feedback, or by commenting on the spot.
About the sources. The content is checked against the primary documents: RICS WLCA v2 with templates, UKNZCBS V1 Rev 1 with submission template, (EU) 2026/52, Boverket (the Swedish National Board of Housing, Building and Planning) 2026:16 and 2026:29, BFS 2021:7, Boverket's register XSD and climate database, and Byggtjänst's CoClass mapping. Anything still based on web searches is marked web. List with checksums: docs/LCA_SOURCES.md.
Reading from the UK
You start from RICS WLCA v2 and UKNZCBS. This view puts the UK first and translates Swedish and EU rules into your terms.
What you already know
- RICS WLCA v2 (Version 3): modules A-C mandatory with D separate, a 60-year study period, kg CO2e/m² GIA, the RICS building-element categories, contingency and uncertainty uplifts.
- UKNZCBS V1 Rev 1: voluntary upfront limits (A1-A3, A4, A5.2, A5.3) per sector and start-on-site year, e.g. office 765 and storage 605 kg CO2e/m² GIA in 2026.
- No legal requirement. Planning policy (London Plan, local plans), certification (BREEAM) and clients drive assessments.
What is different in the other markets
- Sweden regulates by law. The klimatdeklaration (climate declaration) covers A1-A5 only, for the envelope, load-bearing structure and internal walls, without services, reported to Boverket.
- Swedish figures are per m² BTA (to the outside of the external walls) and in GWP-GHG, where biogenic uptake is not counted.
- From 2030 Sweden proposes limits per building type, e.g. 250 for offices and 190 for heated logistics halls over 1,000 m², including services and finishes.
- The EU reports GWP-total over 50 years, A1-C4 plus D1 and D2, per m² useful floor area, in the energy performance certificate from 2028.
Traps when you compare figures
- A UKNZCBS 765 and a Swedish 250 are not the same measure: scope, area basis and GWP variant all differ.
- BTA is larger than GIA (about 1.8% on the validated warehouse), so the same building shows a lower figure per BTA.
- A5.1 means demolition in RICS but construction waste in Boverket's data.
- Swedish regimes are triggered by the date of the building permit application; UKNZCBS by the start on site.
Read firstSwedenThe EU layerComparisonBuilding partsRegulatory radar
Reading from Sweden
You start from the climate declaration and Boverket's proposal for 2028 and 2030. This view puts Sweden first and translates UK and EU rules into your terms.
What you already know
- The climate declaration since 2022: A1-A5 for the envelope, load-bearing structure and internal walls, absolute kg CO2e per building part to Boverket's register, Boverket's climate database with conservative generic values.
- Boverket 2026:16 (consultation): life-cycle GWP from 2028 and limit values from 2030 per building type, in GWP-GHG per m² BTA.
- Voluntary: Miljöbyggnad, NollCO2, LFM30 and municipal requirements in land allocation.
What is different in the other markets
- The UK has no legal requirement. RICS WLCA v2 is the professional standard: modules A-C with D separate, 60 years, area GIA (inside the external walls), and kg CO2e per m³ for storage.
- RICS adds uplifts: contingency of 15, 6 or 0% by design stage plus data-quality and quantity uncertainty, where Sweden uses a conservative factor on generic data.
- UKNZCBS sets voluntary upfront limits per sector and start year, including services, finishes and first fit-out, e.g. office 765 and storage 605 kg CO2e/m² GIA (2026).
- (EU) 2026/52 is what the Swedish 2028 report follows: GWP-total, 50 years, per m² useful floor area.
Traps when you compare figures
- UK figures are per GIA and normally include services; a Swedish declaration figure today does not.
- RICS A5.1 is demolition, not construction waste.
- The UK has no national generic database, and the ICE database may not be used commercially from 30 September 2026.
- UKNZCBS limits follow the start-on-site year, not the date of the building permit application.
Read firstUKThe EU layerComparisonBuilding partsRegulatory radar
Reading from the EU
You start from EN 15978, Level(s) and the EPBD. This view puts the EU framework first, with Sweden as a national implementation and the UK as a market outside the EU.
What you already know
- (EU) 2026/52 sets the method: GWP-total, 50 years, A1-C4 plus D1 and D2, Shell and Core building parts, per m² useful floor area, as-built in the energy performance certificate.
- EPBD Article 7: disclosure from 2028 for new buildings over 1,000 m² and from 2030 for all new buildings, with national limit roadmaps by 1 January 2027.
- National regimes already set limits, e.g. France (RE2020), the Netherlands (MPG), Denmark (BR18) and Finland.
What is different in the other markets
- Sweden is a national implementation: it reports GWP-total from 2028 but sets its 2030 limits in GWP-GHG for A1-A5 per m² BTA.
- The UK is outside the EU. RICS WLCA v2 builds on EN 15978:2011 with its own building-element tree and a 60-year study period.
- UKNZCBS limits are upfront only (A1-A3, A4, A5.2, A5.3) and follow the start-on-site year.
Traps when you compare figures
- Per year or in total: Denmark and Finland state kg CO2e/m² per year over 50 years; Sweden, the UK and (EU) 2026/52 state totals.
- Area bases differ: useful floor area, BTA, GIA, BVO (NL), SREF (FR), heated net area (FI).
- The Netherlands limits a shadow cost in € per m² BVO and year, not kg CO2e; France uses a dynamic LCA.
- RICS A5.1 is demolition; Boverket's A5.1 is construction waste.
Your terms and theirs
| Concept | UK | Sweden | EU |
|---|---|---|---|
| Area basis | GIA (RICS); NIA to classify a building in UKNZCBS | BTA (bruttoarea); Atemp for thresholds | Useful floor area |
| Building-part classification | RICS v2 building-element categories | CoClass (Byggtjänst's mapping for the declaration) | Shell and Core tiers ((EU) 2026/52) |
| Required modules | A-C, D separate (RICS) | A1-A5 today; A-D reported from 2028 (proposal) | A1-C4 plus D1 and D2 |
| GWP indicator | GWP-total, sequestration reported separately | GWP-GHG for the declaration and the 2030 limits | GWP-total |
| Study period | 60 years | None today; 50 years from 2028 | 50 years, total over the period |
| Generic data | No national database; ICE commercial use ends 30 Sep 2026 | Boverket's climate database, conservative values | National choice |
| Uplifts | Contingency 15/6/0% plus data-quality and quantity uncertainty | Conservative factor; coverage of at least 90% from 2028 | None in the EU text |
| What sets the rules in force | Start on site (UKNZCBS) | Date of the building permit application | As-built, in the energy performance certificate |
| Legal status | No legal requirement; voluntary standards and planning policy | Law until March 2027; PBL requirement 2028/2030 (proposal) | Regulation in force, applied through national rules |
| Office limit, upfront | 765 kg CO2e/m² GIA (UKNZCBS, 2026) | 250 kg CO2e/m² BTA (2030 proposal) | None at EU level; e.g. FR 810 kg/m², NL 1.55 €/m² BVO per year |
01The short version
- A building LCA is an LCA of LCAs. You take a bill of quantities with thousands of lines, link each line to a ready-made dataset (EPD or generic value) with LCIA results per module, multiply and sum. The hard parts are quantities, classification, data choices, scenarios and rules.
- Same foundation, different rules. Sweden and the UK both build on EN 15978 and EN 15804. The differences sit in the method profile: modules, building parts, GWP variant, area, generic data and uplifts.
- Sweden today: klimatdeklaration (climate declaration) for A1-A5, klimatskärm (building envelope) + load-bearing parts + internal walls, uptake is not counted, absolute kg CO2e per building part to Boverket's register. Industrial buildings and workshops are exempt.
- Sweden 2028/2030 (proposal): the climate declaration is repealed at the end of March 2027 and replaced by a requirement in PBL (plan- och bygglagen, the Planning and Building Act). EU report in GWP-total from 2028, Swedish limit values in GWP-GHG per m² BTA from 2030, with a separate category for logistics halls.
- UK: no legislation. RICS WLCA v2 (Version 3, Aug 2024) requires A-C with D separate, 60 years, its own building-element categories and uplifts. UKNZCBS V1 gives voluntary limit values per sector and start year.
- EU: (EU) 2026/52 in force since May 2026: GWP-total, 50 years, total per m² useful floor area, seven reporting columns.
- For the data model: store raw data at line level with provenance, calculate per method profile, save reports as immutable snapshots with a scope fingerprint. Store area and volume, and one row per use with its area (mixed-use buildings are weighted by area).
- Validated against real data from a first client: 306 OneClick exports, a verifier's report template and a complete BIM project. The structure held and the line totals reconcile in every file (section 13). The client's own method sits in a client layer on top of the market model.
02What is different about building LCA
Functional unit: a building over a study period
The object is the whole building and the result is normalised to kg CO2e per m². Two things must always be stated: the normalisation unit (Sweden m² BTA, EU m² useful floor area, UK m² GIA and, for industrial and storage buildings, m³ internal volume under RICS) and the reference study period (none for today's Swedish climate declaration, 50 years for the EU and for Sweden from 2028, 60 years for RICS). EN 15978 calls the whole the functional equivalent; results may only be compared between buildings with the same one.
The inventory is a bill of quantities
- Source documentsDrawings, BIM, cost estimate, delivery notes
- Bill of quantities"External wall YV-01, 2,400 m²"
- Building partClassified: RICS 2.5.1, CoClass B10.AD, building envelope
- Material line150 mm mineral wool → 10,800 kg
- DatasetEPD or generic, value per module
- ScenariosA4 transport, A5 waste, B4 replacement, C
- UpliftsCoverage, contingency, top-up
- Reportkg CO2e/m² per module and building part
| Level | What it is | Example |
|---|---|---|
| Element / building part | Functional part of the building | External wall type, ground slab, roof |
| Material / layer | What the element consists of | 150 mm mineral wool, steel sheet, reinforcement |
| Product | What is actually purchased | A named insulation product from a manufacturer |
| Dataset | Environmental data that represents the product | EPD registration number, Boverket resource ID 6000000026, ICE entry |
Declared unit and conversion
An EPD states results per declared unit (1 kg, 1 m³, 1 m², 1 piece). The bill of quantities states the quantity in the designer's unit. Conversion factors are needed between them: density, mass per area, thickness, mass per piece. Unit errors are the most common error, so the factor is always stored with its source.
Scenarios and design stages
A1-A3 come from the dataset. Everything else is scenarios from the EPD, national default values or the project. An LCA is carried out several times as the project matures, and early stages are compensated for with uplifts.
| UK (RIBA Plan of Work) | Sweden | RICS phase |
|---|---|---|
| 0-2 Strategic definition, Preparation, Concept | Programskede (programme stage) | Early design |
| 3-4 Spatial coordination, Technical design | Systemhandling, bygghandling (scheme design, construction documents) | Technical design |
| 5 Manufacturing & construction | Produktion (construction) | Construction |
| 6-7 Handover, Use | Relationshandling (as-built) | Post-completion |
The Swedish climate declaration is made as-built, before the slutbesked (completion certificate). RICS requires an early baseline plus as-built.
03The standards pyramid
From the foundation up to the client. Each level builds on the one below.
| Level | Sweden | UK | EU / common |
|---|---|---|---|
| Client (client layer) | Property owners' and investors' own methods and templates: selection of building parts, own area, own uplifts and targets | ||
| Voluntary | Miljöbyggnad 4.x, NollCO2 2.0, BREEAM-SE, LFM30 | UKNZCBS V1, LETI, RIBA 2030, SCORS, BREEAM V7, GLA | Level(s) 1.2 |
| National method | Act 2021:787 + BFS 2021:7; proposed PBL requirement 2028/2030 | RICS WLCA 2nd ed. (professional standard) | EPBD 2024/1275 + (EU) 2026/52 |
| European standard | EN 15978 (building, new edition 2026) · EN 15804+A2 (product) · EN 15941:2024 (data quality) · EN 15643 (framework) | ||
| Foundation | ISO 14040/44 · ISO 14025 (type III EPD) · ISO 21930 · ISO 21931-1 · ISO 15686 (service life) · ISO 22057 (EPD in BIM) | ||
EN 15978:2026 is published (CEN Nov 2025, BS EN July 2026, SS-EN available) and replaces the 2011 edition after roughly 24 months of coexistence. New: module A0, voluntary B8, D split into D1/D2, indicators aligned with EN 15804+A2. RICS v2 and the climate declaration are still based on the 2011 edition.
04Life-cycle modules A0-D
The modules are the most important dimension in the data model. Choose a method to see what it counts.
The EU report has seven columns: A1-A3 | A4-A5 | B1-B4 | B6 | C1-C4 | D1 | D2. A0 does not appear in the EU text. RICS and the EU split B1 into B1.1 (materials, carbonation) and B1.2 (refrigerants).
A5 is split differently, and the code A5.1 means two things
| Sweden | RICS v2 | Content |
|---|---|---|
| A5 waste: in Boverket's API A5.1, in the register a5ByggspillGK/SK | A5.3 Waste | SE: (waste factor − 1) × (A1-A3 conservative + A4). RICS: waste rate × (A1-A3 + A4 + C modules by treatment route). |
| A5 energy (energiPaverkan) | A5.2 Construction activities | SE: measured quantity × generic energy factor. RICS: default 40 kg CO2e/m² GIA. |
| not included | A5.1 Pre-construction demolition | 35 kg CO2e/m² demolished GIA, demolition within 3 years before the project |
| not included | A5.4 Worker transport | Voluntary |
Code clash. Boverket's "A5.1" is construction waste, RICS "A5.1" is demolition. The model stores sub-modules with a system-specific code (A5_SE_SPILL, A5.3) and aliases per source, and flags an A5.1 with no system given.
05Product level: EPDs and EN 15804
An EPD is a third-party verified type III declaration (ISO 14025) under EN 15804, with LCIA results per module and indicator for a declared unit. It is published by a programme operator (International EPD System, BRE, EPD Hub, IBU, EPD Norge) and is valid for 5 years.
+A1 versus +A2: why the GWP figures cannot be compared directly
| EN 15804+A1 (2013) | EN 15804+A2 (2019, required for new EPDs since 2022) | |
|---|---|---|
| Characterisation | CML-IA (AR4-era GWP100) | EF 3.0 (AR5-based GWP100) |
| GWP | A single figure, usually without biogenic | GWP-total = fossil + biogenic + luluc |
| Biogenic carbon | Often 0/0 or omitted | -1/+1: uptake negative in A1-A3, release in C3/C4 |
| Mandatory modules | A1-A3 | A1-A3 + C1-C4 + D |
The GWP variants
| Variant | Definition | Used by |
|---|---|---|
| GWP-total | fossil + biogenic + luluc | EU EPBD, RICS (sequestration separate) |
| GWP-fossil | Fossil emissions | Part of total |
| GWP-biogenic | Biogenic uptake and release | Reported separately |
| GWP-luluc | Land use | Part of total |
| GWP-GHG | Everything except biogenic CO2 uptake/release | Swedish climate declaration and the proposed 2030 limit value |
RICS accepts +A1 (sequestration is then calculated separately). Boverket's climate database is calculated under EN 15804:A1 and supplies "GWP-GHG AR4". Where an EPD lacks GWP-GHG, Boverket proposes: GWP-GHG(A1-A5) = GWP-total(A1-A5) + 44/12 × biogenic carbon in product and packaging.
Timber often gets a negative GWP-total in A1-A3 that is only balanced out in C. That is why Sweden uses GWP-GHG and RICS reports sequestration separately. The model flags derived values.
Zero is not the same as missing
An EPD can state a module as a value, ND/MND (not declared) or MNR (not relevant). The model distinguishes between them; otherwise a missing C module looks like zero emissions.
Data sources and formats
Boverket's climate database
230 Swedish generic entries, typical and conservative (+25%) value, API in JSON/XML.
ICE v4.1
British generic database, free Excel, included in BECD.
ÖKOBAUDAT
German, generic and specific +A2 datasets in ILCD format.
ILCD+EPD v1.3
XML format for EPDs (Jan 2026). Canonical import from the Environdec API, ECO Portal.
openEPD
JSON/OpenAPI from Building Transparency (EC3) and EPD Hub.
IFC 4.3
BIM quantities via Qto_*, environmental data via Pset_EnvironmentalImpact*.
06Sweden
Reading from the UK. Sweden regulates by law and keys the regime to the date of the building permit application. Read every figure here as kg CO2e per m² BTA, A1-A5, in GWP-GHG. The 2022 declaration leaves out services and finishes, so its figures are not comparable with a RICS or UKNZCBS figure.
Reading from the EU. Sweden's 2028 requirement follows (EU) 2026/52 for reporting, but the 2030 limits use GWP-GHG for A1-A5 per m² BTA, a national choice. Coverage of at least 90% and a conservative factor on generic data are Swedish additions with no counterpart in the EU text.
Climate declaration, 2022 up to and including March 2027
| Rule | Source |
|---|---|
| Scope: "hela byggnadens klimatskärm och byggnadens samtliga bärande konstruktionsdelar och innerväggar" (the building's entire envelope and all of the building's load-bearing structural parts and internal walls) | Ordinance 2021:789 5 § |
| Product stage A1-A3, construction process stage A4-A5, climate data in kg CO2e per unit of resource | BFS 2021:7 2 § |
| A1-A3: EPD under a PCR, third-party verified or equivalent, or generic data from Boverket's climate database | BFS 4 § |
| A4: generic data from the climate database | BFS 5 § |
| A5 waste: generic or specific (specific only if used in A1-A3). A5 energy: generic energy factors. | BFS 6 § |
| Exemptions: internal finishes on the envelope and load-bearing parts, finishes on internal walls | BFS 7 § |
| Uptake of greenhouse gases may not be counted (hence GWP-GHG) | BFS 8 § |
| Conservative values (typical × 1.25) must be used | Boverket's guidance web, not BFS |
| Exempt buildings: industrial and workshop buildings, ≤ 100 m² BTA, temporary permit ≤ 2 years, etc. | Act 2021:787 |
Byggtjänst's interpretation with CoClass codes
| Part | Included | Not included |
|---|---|---|
| Grundläggning (foundations) A20.AB A20.BF | Slab on ground, pad foundations, strip footings, foundation walls, insulation under the foundation | Piles, stabilisation, retaining walls, capillary break layers, drainage gravel, pipework |
| Övriga bärande (other load-bearing) B.BD C.AF C.AG C.AH C.BC C.BF C.BG D.BE S.RD10 | Frame, wall against ground, stairs incl. balustrades, ramps, roof structure, balconies, access decks, structural toppings | Decks outside the envelope, canopies |
| Klimatskärm (building envelope) B10.AD B10.AN B10.RD32 B30.AD S.RE12.FSZ D.AD | External wall up to and including the internal board, roof, integrated solar PV, facade, external render and paint, windows, external doors | Internal finishes, solar shading, roof safety, rainwater systems, facade ladders |
| Innerväggar (internal walls) B20.AD B20.RD32 | Internal walls up to and including the board, glazed partitions, internal doors, raised subfloor, suspended ceilings, ceilings | Filler, paint, wallpaper, parquet, linoleum, tiles, skirting |
What the register accepts
XSD 2026-06-02: all fields are integers except four text fields, no enumerations.
byggnad (building, 31 fields)
BTA per use category (smahusBTA … handelBTA, ovrigtBTA), storeys, basement levels, garage, solar PV area, balconies and access decks, material shares in per cent for foundations and other load-bearing parts.
klimat (climate, 15 fields)
Absolute kg CO2e for A1-A3 per building part (foundations, other load-bearing, envelope, internal walls) split GK/SK, A4 GK/SK, A5 waste GK/SK, A5 energy, scaling-up and coverage.
Missing
No total area, no kg/m² value, no material lines. A logistics warehouse ends up in ovrigtBTA.
What is coming: Boverket report 2026:16 (remiss, consultation)
| Parameter | Proposal |
|---|---|
| Legal form | Act 2021:787 is repealed at the end of March 2027. New requirement in Chapter 8, 4 b § PBL from 1 Jan 2028, limit value from 1 Jan 2030. From April to December 2027 no requirement applies. |
| Control | The byggnadsnämnd (municipal building committee) via building permit, inspection plan and completion certificate (GWP-total and GWP-GHG). The register and Boverket's supervision are wound down. |
| Which buildings | Those requiring a building permit and covered by the energideklaration (energy performance certificate). 2028-2029: > 1,000 m² usable floor area (Atemp, heated floor area); from 2030: ≥ 50 m². |
| Exemptions | Industrial and workshop buildings, religious buildings, holiday homes, temporary buildings, buildings not requiring a building permit. Unheated halls (below 10 °C) are not covered. |
| Limit value | A1-A5, GWP-GHG, kg CO2e/m² BTA, updated every 5 years, BTA-weighted for mixed use |
| Building parts | Everything incl. finishes and services on the plot, except ground reinforcement, renewable electricity and operation-related equipment (these are, however, included in the LCA). Racking systems are not included. |
| Coverage | ≥ 90% incl. default values (today 50%), scaled up to 100% |
| Sanction | Above the limit value 0.5 pbb (prisbasbelopp, price base amount) + 0.002 pbb/m² BTA; incorrectly reported as below 0.5 + 0.004 pbb/m² BTA |
| Category | Limit value 2030 | Reference 2020 |
|---|---|---|
| Småhus (small houses) ≥ 130 m² / < 130 m² | 130 / 150 | 171 / 196 |
| Flerbostadshus (multi-dwelling buildings) | 235 | 358 |
| Logibyggnader (lodging buildings) | 240 | 364 |
| Kontor, vårdcentral, förskola, skola (office, health centre, preschool, school) | 250 | 382-384 |
| Hallbyggnader för logistik och handel (hall buildings for logistics and retail) > 1,000 m² | 190 | 291 (median, P75 330, n = 28) |
| Simhallar (swimming halls) | 455 | |
| Skyddsrum (civil defence shelters, that part only) | 1,500 | |
| Övriga byggnader (other buildings) | 295 | 449 (highest P75) |
The limit values are around 35% below the 2020 median. In the hall data, Boverket added +40 kg/m² where finishes and services were missing (around 20 where they were reported), and measured A5 energy was 10-60% of the default value. The roadmap (draft 2026:29) covers only A1-A5; the 2040 milestone is based on the EU target of a 90% reduction compared with 1990, linear 2030-2040. No figures are given for 2035-2050.
Boverket's climate database 02.07.000
Content
230 entries: 208 construction products, 22 energy and fuels. Calculated under EN 15804:A1, indicator "GWP-GHG AR4".
Per entry
ResourceId, unit, conservative factor 1.25, waste factor 1.0-1.2, service life (text), conversions, BK04 code, transport legs, values for A1-A3 typical/conservative, A4, A5.1 (waste).
Derivation
Waste = (waste factor − 1) × (A1-A3 conservative + A4). Example concrete C20/25: typical 0.0977, conservative 0.122, A4 0.00472, waste 0.00381 kg CO2e/kg.
API
GET /api/Klimat/v2/GetAllResources/{version}/{culture}/{type} and others, JSON and XML. New major version early 2027 with GWP-total.
07UK
Reading from Sweden. There is no law here: the method comes from RICS and the limits from voluntary UKNZCBS, planning policy and clients. Read figures as kg CO2e per m² GIA (inside the external walls). RICS covers A-C over 60 years and adds contingency and uncertainty uplifts instead of a conservative factor.
Reading from the EU. The UK is outside the EU and the EPBD does not apply. RICS WLCA v2 still builds on EN 15978:2011, not the 2026 edition, uses its own building-element tree and a 60-year study period, and reports sequestration separately.
There is no legal requirement on embodied carbon web. Requirements come from the RICS standard, planning requirements, voluntary standards and clients.
RICS WLCA 2nd edition, Version 3 (Aug 2024)
| Parameter | Rule |
|---|---|
| Mandatory | A-C for the whole asset, D separate. Voluntary: A0 (assumed 0), A5.4, B7.2, B7.3, B8. |
| Small projects | < 1,000 m² GIA or ≤ 10 dwellings: may be limited to A1-A5, B1-B5, C1-C4 |
| Study period | 60 years (infrastructure 120, standalone fit-out 20 and 60) |
| Normalisation | kg CO2e/m² GIA; industrial, storage, distribution: kg CO2e/m³ internal volume; external works per m² of external area |
| Building parts | RICS's own categories (renumbered from NRM). Level 2 mandatory after concept design. Shell & core / Cat A / Cat B are scope, not codes. |
| Cut-off | No percentage rule; everything in scope must be included, exclusions are justified and reported |
| Biogenic | -1/+1, sequestration separate and outside upfront, certified timber only (FSC, PEFC or equivalent) |
| Scenarios | Both decarbonised and non-decarbonised. B6: National Grid FES "Falling Short" excl. BECCS. |
| Data hierarchy | Product EPD → regional sector EPD → representative sector EPD → generic database (BECD first) → proxy. +A1 accepted. |
Uplifts
| Phase (RIBA) | Contingency | Data quality | Quantity |
|---|---|---|---|
| Early design (0-2) | 15% | no | no |
| Technical design, construction (3-5) | 6% | 0-7% | 0-4% |
| Post-completion (6) | 0% | 0-7% | 0-4% |
Contingency applies to all modules except B6-B8. Data quality is scored for the 10 most important products: geography 0-10, technology 0-6, product specificity 0-6, time 0-8, granularity 0-5, verification 0-5 (max 40). The weighted mean gives the uplift: ≤ 10 points 7%, 35-40 points 1%, 40 points 0%. Quantity uncertainty: 0 measured, 1 designed, 3 estimated, 5 benchmark, which gives 0-4%. The confidence score must be reported.
The link to client methods. For example, a property owner's top-up uses RICS v2's two factors (data quality and quantity), scored on the 10 largest A1-A3 products. The result is one factor for the whole project applied to every row, default 11%. The RICS phase contingency is set to 0.
Default values
| Module | Value |
|---|---|
| A4 | Ready-mix concrete 20 km · local 50 km · regional 80 km · national 120 km · Europe 1,500 km road + 100 km sea · global 500 km road + 10,000 km sea. Empty running 43% by road. |
| A5.1 / A5.2 | 35 kg CO2e/m² demolished GIA / 40 kg CO2e/m² GIA |
| A5.3 | Waste 1% (precast concrete, steel frame, glass) to 10% (sprayed concrete, aggregate); in-situ concrete and reinforcement 5%, insulation 7% |
| B2 / B3 | max(10 kg/m² GIA, 1% of A1-A5) / 25% of B2 |
| B4 | Whole replacements, rounded up. Service lives: frame 60, windows 30, doors 20, waterproofing 30, heat pump 15, lighting 15, lifts 20. |
UKNZCBS V1 Rev 1 (Apr 2026): Storage & Distribution
Industry standard with mandatory third-party verification, only for completed and occupied buildings. The upfront limit covers A1-A3, A4, A5.2 and A5.3 without sequestration, with the RICS uncertainty uplift. In: RICS 0.1.2, 1, 2, 3, 4.1-4.3, 5 except solar PV, first fit-out. Out: 0.1.1, A5.1, external works (8), solar PV (own limit), loose furniture. The limit year is the date of commencement. Internal volume is a mandatory field for storage. Offices within the warehouse are classed as Offices.
| Start year | New build, whole building | New build, shell & core* | Retrofit, whole building |
|---|---|---|---|
| 2025 | 635 | 415 | 390 |
| 2026 | 605 | 395 | 370 |
| 2027 | 570 | 375 | 350 |
| 2028 | 540 | 355 | 330 |
| 2030 | 475 | 305 | 290 |
| 2035 | 315 | 205 | 190 |
| 2040 | 200 | 130 | 120 |
| 2045 | 115 | 75 | 70 |
| 2050 | 50 | 35 | 30 |
kg CO2e/m² GIA. *Shell & core limits are used only in Annex E and F2; the main claim is tested against the whole building including first fit-out. Solar PV: 1,000 kg CO2e/kWp in the standard, 750 in the submission template. Operational energy, new build 2026: unheated 39, heated 88, cold store 169 kWh/m²/yr.
BREEAM UK New Construction V7, Mat 01 web
BREEAM certification is more common than stand-alone LCA in the UK market, and owners often require "Excellent" on every building, so Mat 01 drives LCA volume.
| Topic | Rule | Status |
|---|---|---|
| Stages | V7 rewrote Mat 01 (aligned between UK and International). Credits for a concept design LCA with embodied carbon reporting and for a technical design LCA. Practitioners report that an as-built LCA must now also be submitted, so one building can need three assessments. | Design stages: BRE GN51 (Jul 2026). As-built: practitioner input, to be confirmed. |
| Method | Practitioners report that the Mat 01 LCA now aligns with RICS WLCA v2. 60-year study period for all stages. | Verify against the V7 manual |
| Tool | Only BREEAM-recognised LCA tools are accepted: IMPACT-compliant tools or tools evaluated by BRE (list KBCN1118). A new tool applies to BRE. | BRE Knowledge Base |
| Scope | Wider than many client target scopes: elements a client reports outside its target can still be required. | Practitioner input |
In the model the three stages are linked assessments of one building, the BREEAM profile carries the required stages and the tool rule, and the tool used is recorded so that compliance can be checked.
Other systems and reference values
LETI has bands per type (office, residential, schools, retail; band A around 300-350 kg/m² GIA), RIBA 2030 has whole life-cycle targets (office 750, residential 625), the GLA has benchmarks, SCORS covers only the structure, and the draft London Plan 2026 proposes 500/700 for residential under/over 11 m and 700 for Use Class E web. None of them has a storage category.
08The EU layer
Reading from the UK. (EU) 2026/52 does not apply in the UK, but UK owners with assets in the EU report under it from 2028. Compared with RICS: 50 years instead of 60, a total per m² useful floor area instead of per m² GIA, and Shell and Core tiers instead of the RICS categories.
Reading from Sweden. This is the framework that Boverket's 2028 proposal implements. The EU text has no coverage rule, no uplift for default values and no standard service lives, so Sweden fills those gaps nationally.
Delegated Regulation (EU) 2026/52
| Parameter | Rule |
|---|---|
| Dates | Adopted 16 Dec 2025, OJ 4 May 2026, in force 20 days later. Replaces Annex III of the EPBD. |
| Indicator and period | GWP-total, 50 years, total over the period per m² useful floor area, as-built, in the energy performance certificate |
| Modules | A1-A5, B1.1, B1.2, B2-B4, B6, C1-C4, D1, D2 mandatory; B5, B7, B8 voluntary; A0 does not exist |
| Building parts | All Tier 2 under Shell (foundations incl. piling, frame incl. mezzanines, envelope incl. industrial doors and roof covering) and Core (internal works, built-in furniture, finishes, 10 service groups incl. solar PV and batteries). External works voluntary. |
| Data hierarchy | CPR declarations must be used where available, then ecodesign, project/product-specific and sector data (if nationally permitted), generic, default values |
| Missing | Uplifts for default values, cut-off, default service lives, transport and waste defaults |
| National choices | B4 replacement rule and allocation method (mandatory choices), B6 limited to B6.1, forward-looking factors, worst-case scenarios |
EPBD Art. 7 (2028/2030, roadmaps by 1 Jan 2027), CPR 2024/3110, EN 15978:2026 and Level(s) have not been verified against the primary text web.
Certification on the continent. In Germany the main scheme is DGNB (System 2023, criterion ENV1.1 for new buildings), which refers in many places to the calculation rules of QNG (Qualitätssiegel Nachhaltiges Gebäude). Assessments made for BREEAM, DGNB or a client method are often the same model adapted, so the model keeps one inventory and reports it per profile. DGNB parameters are not yet modelled web.
09Comparison, parameter by parameter
| Parameter | SE climate decl. | SE proposal 2030 | EU 2026/52 | UK RICS v2 | UKNZCBS V1 | Example client method |
|---|---|---|---|---|---|---|
| Status | Law until March 2027 | Proposal | In force, reporting 2028 | Prof. standard | Industry standard | Client requirement (client layer) |
| Modules | A1-A5 | Limit A1-A5, report A-D | A1-C4, D1/D2 | A-C, D separate | A1-A3, A4, A5.2, A5.3 | A1-A5 |
| GWP | Uptake not counted | Limit GWP-GHG, report GWP-total | GWP-total | GWP-total, seq. separate | Excl. sequestration | Excl. sequestration |
| Study period | None | 50 years | 50 years | 60 years | 60 years (A-C) | None |
| Unit | absolute kg + BTA | kg/m² BTA | kg/m² useful floor area | kg/m² GIA, storage kg/m³ | kg/m² GIA (+ m³) | kg/m² NLA (entered as GIA) |
| Building parts | Envelope, load-bearing, internal walls | Nearly everything | Shell + Core | All RICS categories | 0.1.2-5 except solar PV | 12 RICS v2 rows + site emissions |
| Services | No | Yes | Yes | Yes | Yes | No |
| External works | No | Partly | Voluntary | Yes | No | Yard in the target, other secondary |
| Uplifts | Conservative factor, coverage | Coverage ≥ 90% | None | Contingency + uncertainty | Uncertainty | Top-up for the whole project (11%) |
| Limit, logistics | None | 190 | National from 2030 | None | 605 (2026), 475 (2030) | Own target |
| Limit, office | None | 250 | National from 2030 | None | 765 (2026), 595 (2030) | Own target |
| Control | Boverket | Building committee | Energy performance certificate | Verifier | Third-party verifier | Client's verifier |
Five differences that affect the figure most
- Building-part scope: services, finishes and external works in or out. Boverket added +40 kg/m² for missing finishes and services in halls.
- Normalisation: BTA (outside) versus GIA (inside) versus m³ internal volume (RICS for storage).
- Generic data: +25% on Boverket's product data; RICS has uncertainty uplifts instead.
- A5: measured energy in Sweden versus 40 kg/m² GIA in RICS.
- GWP variant: GWP-GHG versus GWP-total, a large difference for timber.
Limit values by building type
All values are held in benchmarks.json with scope, status and source, and are linked to the neutral building types in building-uses.json. The values cannot be compared directly: UKNZCBS is upfront per m² GIA, SE is A1-A5 GWP-GHG per m² BTA, FR is dynamic LCA over 50 years, NL is a shadow cost in €/m² BVO per year.
| Building type | UKNZCBS 2026 (2030) | SE 2030 proposal | Boverket reference | FR RE2020 2025 (2028) | NL MPG 2026 | LETI band A |
|---|---|---|---|---|---|---|
| Small houses | 400 (290) | 130 / 150 | 171 / 196 | 530 (475) | 1.60 | 300 |
| Multi-dwelling buildings | 525 (380) | 235 | 358 | 650 (580) | 1.60 | 300 |
| Office | 765 (595) | 250 | 383 | 810 (710) | 1.55 | 350 |
| School | 555 (435) | 250 | 382 | 770 (680) | 1.85 | 300 |
| Retail | 680 (535) | 190 hall > 1,000 m², otherwise 295 | 291 (hall) | 800 (proposal) | 1.85 | 300 |
| Hotel | 635 (500) | 240 | 364 | 820 (proposal) | 1.85 | |
| Healthcare | 750 (590) | 250 / 295 | 383 | 1.85 | ||
| Storage and logistics | 605 (475) | 190 (heated hall) | 291 | covered, value not found | 1.85 | |
| Data centre | 705 (555) | 295 | 1.85 | |||
| Laboratory | 715 (565) | 295 |
The Nordic countries calculate per year over 50 years: Denmark (from 1 July 2025, incl. B6) 6.7 small houses, 7.5 multi-dwelling buildings, offices, retail and storage, 8.0 other, plus 1.5 for A4-A5; Finland (from 9 Jan 2026) 16 to 29 kg/m² heated net area per year depending on type web. UKNZCBS and SE are read from the primary documents; FR, NL, LETI, DK and FI are based on secondary sources.
10Building parts in scope
There is no official crosswalk between the Swedish and British building-part systems, so we build our own with a neutral code as the pivot. The UK codes are RICS v2's building-element categories. The CoClass codes come from Svensk Byggtjänst's mapping for the climate declaration. The table is read from building-part-crosswalk.json v0.4 (the market layer). A client's own report rows are added as an extra column in the client layer.
BREEAM UK and GLA exports use the older RICS code tree, where the same number means different things (8.2 is roads in the old tree but planting in v2). Which code system applies is therefore determined by the tool, according to source-labels.json.
| Neutral code | Building part | RICS v2 | CoClass | SE 2022 | SE 2030 | EU | UKNZCBS | SCORS | Note | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 Facilitating works | |||||||||||
| FAC.TREATMENT_DEMOLITION | Remediation and demolition Toxic/contaminated material treatment; demolition works | 0.1.1 | none | out | out | n/a | out | out | Demolition is reported as module A5.1 (RICS 35 kgCO2e/m2 demolished GIA). UKNZCBS: 0.1.1 and A5.1 outside the limit value. | ||
| FAC.FACILITATING | Facilitating works, specialist groundworks Facilitating works (temporary supports, facade retention, specialist groundworks, diversions, site investigation, site preparation) | 0.1.2 | none | out | out | n/a | in | out | UKNZCBS: included under the standard (the pro forma's label says out but the formula counts it in). | ||
| 1 Substructure and foundations | |||||||||||
| SUB.FOUNDATIONS | Foundations (strip footings, pad foundations, foundation walls) Foundations | 1.1 | A20.AB | in | in | in | in | in | RICS v2 1.1 combines foundations and piling; separate them by keyword (pile, pfahl, pieu, palo, CFA). Piles were found by keyword in 48 projects. | ||
| SUB.PILES | Piles and ground reinforcement Piling, ground improvement | 1.1 | none | out | partly | in | in | in | SE 2022: excluded (Byggtjänst/Boverket). SE 2030: ground reinforcement is excluded from the limit value but included in the LCA (GWP-total). EU Tier 3: foundation piling included. | ||
| SUB.GROUND_SLAB | Ground slab (slab on ground incl. insulation below) Lowest slab (ground-bearing slab) | 1.2.1 | A20.BF A20.AB | in | in | in | in | in | SE: up to and including insulation under the foundation; capillary break layers and drainage gravel out. The largest item in single-storey logistics. | ||
| SUB.BASEMENT | Basement (suspended slabs and retaining walls) Basement suspended slabs and retaining walls | 1.2.2, 1.2.3 | B30.AD | partly | in | in | in | in | SE: wall against ground included, excavation and freestanding retaining walls out. | ||
| 2 Frame and envelope | |||||||||||
| SUP.FRAME | Frame (columns, beams, load-bearing walls, bracing) Frame (vertical and horizontal) | 2.1 | B.BD | in | in | in | in | in | Incl. fire protection on steel under EU Tier 3. Precast walls at loading doors are sometimes coded 2.1 even though they are external walls (flag CLASSIFICATION_CONFLICT). | ||
| SUP.UPPER_FLOORS | Upper floors (incl. mezzanines) Upper floors | 2.2 | C.BC C.BF | in | in | in | in | in | RICS v2 2.2.1/2.2.2 refer to 'upper floor and roof' load-bearing/non-load-bearing; split floors and roof using the description. | ||
| SUP.ROOF_STRUCTURE | Roof structure (roof beams, purlins) Roof structure | 2.3 | D.BE | in | in | in | in | in | |||
| SUP.STAIRS | Stairs, ramps and safety guarding Stairs, ramps and safety guarding | 2.4 | C.AF C.AG S.RD10 | in | in | in | in | in | SE 2022: stairs incl. balustrades, ramps, balconies and access decks are included (Byggtjänst). | ||
| SUP.EXTERNAL_WALLS | External wall and facade External opaque envelope and full-height glazing | 2.5.1, 2.5.2 | B10.AD B10.AN S.RE12.FSZ | in | in | in | in | partly | SE 2022: up to and including the internal board; external render and paint included. SCORS: load-bearing parts only. | ||
| SUP.ROOF_COVERING | Roof covering (waterproofing, insulation, finish) External roof finishes/coverings | 2.5.3 | D.AD | in | in | in | in | out | RICS v2 puts roof covering in 2.5 (envelope), not in 2.3. SE 2022: soil and plants on green roofs out. | ||
| SUP.ENVELOPE_SAFETY | Safety systems on the envelope External safety systems (roof safety, facade access) | 2.5.4 | none | out | in | in | in | out | SE 2022: roof safety, facade ladders, external fire escapes and sun protection out (Byggtjänst). | ||
| SUP.WINDOWS_DOORS | Windows, rooflights, external doors and industrial doors Windows (vertical, roof) and external doors | 2.6 | B10.RD32 | in | in | in | in | out | Incl. loading doors, roller doors and fire doors (EU Tier 3). Rooflights are RICS 2.6.2. | ||
| SUP.INTERNAL_WALLS | Internal walls and glazed partitions Internal walls and partitions | 2.7 | B20.AD | in | in | in | in | partly | SE 2022: non-load-bearing internal walls up to and including the board, glazed partitions, mesh partitions. | ||
| SUP.INTERNAL_DOORS | Internal doors Internal doors | 2.8 | B20.RD32 | in | in | in | in | out | Climate database 2026: internal doors were raised sharply (e.g. 0.18 to 1.43 kg CO2e/kg). | ||
| 3 Finishes | |||||||||||
| FIN.WALL | Wall finishes (internal) Wall finishes | 3.1 | none | out | in | in | in | out | BFS 2021:7 7 §: internal finishes are explicitly excluded. | ||
| FIN.FLOOR | Floors: raised floor, levelling screed, floor covering Raised floor, non-structural screed, floor finishes | 3.2 | none | partly | in | in | in | out | SE 2022: raised subfloor in; parquet, linoleum, tiles out. Levelling/screed unclear. Split into 3.2.1/3.2.2/3.2.3. | ||
| FIN.CEILING | Ceilings and suspended ceilings Ceiling finishes and suspended ceilings | 3.3 | C.BG | partly | in | in | in | out | SE 2022: suspended ceilings and ceilings in, surface treatment out. | ||
| 4 Fittings and furnishings | |||||||||||
| FFE.FIXED | Fixed fittings General, kitchen and specialist FF&E (fixed) | 4.1, 4.2, 4.3 | none | out | in | in | in | out | EU: built-in furniture included. SE 2030: operation-related equipment is excluded, racking systems are not included. | ||
| FFE.LOOSE | Loose furniture, IT, AV Loose FF&E, IT, audio-visual | 4.4, 4.5, 4.6 | none | out | out | out | out | out | UKNZCBS: out except for offices. | ||
| 5 Services | |||||||||||
| SERV.PUBLIC_HEALTH | Water and drainage: sanitaryware, cold water, foul and surface water drainage Public health (sanitaryware, cold water, drainage, rainwater) | 5.1 | none | out | in | in | in | out | SE 2022: roof rainwater systems out. | ||
| SERV.HVAC | Heating, cooling and ventilation HVAC (heating, hot water, cooling, air movement, ventilation) | 5.2 | none | out | in | in | in | out | EU Tier 2: heating incl. heat pump and district heating substation, dedicated cooling, ventilation. | ||
| SERV.ELECTRICAL | Electrical, lighting, telecoms, security, controls, fire alarm Electrical (lighting, power, ELV, IT, BMS, backup, fire detection) | 5.3 | none | out | in | in | in | out | |||
| SERV.RENEWABLES | Solar PV and energy storage On-site renewable generation and storage | 5.4 | none | partly | out | in | out | out | SE 2022: building-integrated solar PV included. SE 2030: excluded from the limit value but included in the LCA. UKNZCBS: own limit per kWp (1000 in the standard V1 Rev 1, 750 in the pro forma), batteries out. | ||
| SERV.LIFE_SAFETY | Sprinklers, fire fighting, lightning protection Life safety (sprinklers, fire fighting, lightning protection) | 5.5.1 | none | out | in | in | in | out | Sprinkler systems are large in logistics. | ||
| SERV.LIFTS | Lifts, escalators, lifting tables Lift and conveyor installations | 5.5.3 | none | out | ? | in | in | out | Dock ramps/dock levellers: check whether they count as operation-related in SE 2030. The template numbers them 5.5.2.x. Dock levellers, dock shelters and impact protection are modelled in BIM but are often missing in OneClick. | ||
| SERV.OTHER | Fuel, waste disposal systems, specialist installations, builder's work for openings Fuel, waste disposal, specialist installations, BWIC | 5.5.2, 5.5.4, 5.5.5, 5.5.6 | none | out | in | in | in | out | |||
| 6 Prefabricated | |||||||||||
| PREFAB | Prefabricated buildings and modules Prefabricated buildings and building units | 6 | none | ? | ? | ? | partly | ? | Break down into the constituent building parts where possible. The UKNZCBS pro forma does not count 6 in the limit value; the standard does. | ||
| 7 Existing / tenant | |||||||||||
| EXISTING | Works to an existing building Works to existing buildings | 7 | none | n/a | n/a | n/a | partly | n/a | Not relevant for new construction. The UKNZCBS pro forma excludes 7. | ||
| 8 External works | |||||||||||
| EXT.ROADS_YARD | Roads, yard areas, parking, pavings Roads, paths, pavings and surfaces (yard) | 8.1.1 | none | out | ? | voluntary | out | out | Large item in logistics, keep separate. | ||
| EXT.FENCING | Fences, railings, walls Fencing, railings and walls | 8.1.2 | none | out | ? | voluntary | out | out | |||
| EXT.FIXTURES | External equipment External fixtures | 8.1.3 | none | out | ? | voluntary | out | out | |||
| EXT.LANDSCAPE | Planting and landscape Soft landscape, planting, irrigation | 8.2 | none | out | ? | voluntary | out | out | |||
| EXT.DRAINAGE | External drainage and surface water External drainage | 8.3.1 | none | out | ? | voluntary | out | out | Often significant (stormwater attenuation tanks) in logistics. | ||
| EXT.SERVICES | External services External services | 8.3.2 | none | out | partly | voluntary | out | out | SE 2030: services on the plot covered by the energy performance certificate are included. | ||
| EXT.ANCILLARY | Minor buildings (gatehouse etc.) Minor building works and ancillary buildings | 8.3.3 | none | ? | ? | voluntary | out | out | May be a separate building in SE with its own declaration. | ||
| Tenant fit-out | |||||||||||
| FITOUT.TENANT | Tenant fit-out (Cat B) Tenant fit-out (Category B) | 7 | none | ? | ? | ? | in | out | RICS v2: shell & core / Cat A / Cat B are scope, not element codes. UKNZCBS: first fit-out is included in New Works. | ||
| Whole-building rows (no building part) | |||||||||||
| SITE.CONSTRUCTION | Construction site emissions | A5.2 | Construction Emissions | No building part. SE: A5 energy (measured quantity, generic energy factors). RICS: A5.2, default 40 kgCO2e/m2 GIA. | |||||||
| SITE.PRECONSTRUCTION | Pre-construction | A0 | RICS: assumed zero for buildings. | ||||||||
| SITE.ENERGY_IN_USE | Operational energy and renewables | B6 | |||||||||
| SITE.WATER_IN_USE | Operational water | B7 | |||||||||
| SITE.USER | Users' activities | B8 | |||||||||
11The data model
Design principles
- Raw data at line level, always. Quantity, unit, raw classification, raw material name, dataset, scenario. It is the only thing that can be recalculated.
- Method profile as configuration. Each method is a record: modules, indicator, study period, area, building-part scope, uplifts, data hierarchy.
- Classifications are many-to-many, with a neutral building-part code as the pivot.
- Every uplift is its own record, never baked into a factor.
- Indicator values in a long table: dataset × module × scenario × indicator → value + status.
- Every result carries a scope fingerprint.
- Reports are immutable snapshots with a hash.
- Version everything that changes: databases, methods, default values, mappings.
- Provenance everywhere: where the quantity, the factor and the scenario came from.
Entity diagram
erDiagram
ORGANISATION ||--o{ PROJECT : "owns / assesses"
PROJECT ||--o{ BUILDING : contains
BUILDING ||--o{ AREA_MEASUREMENT : areas
BUILDING ||--o{ ASSESSMENT : "assessed in"
METHOD_PROFILE ||--o{ ASSESSMENT : governs
ASSESSMENT ||--o{ ELEMENT : BoQ
ELEMENT ||--o{ MATERIAL_LINE : "consists of"
MATERIAL_LINE }o--|| DATASET : uses
MATERIAL_LINE }o--o{ SCENARIO : "A4 A5 B4 C"
DATASET ||--o{ INDICATOR_VALUE : "module x indicator"
ELEMENT }o--o{ CLASSIFICATION_CODE : classified
CLASSIFICATION_CODE ||--o{ CLASSIFICATION_MAPPING : mapped
ASSESSMENT ||--o{ ADJUSTMENT : uplifts
ASSESSMENT ||--o{ RESULT : calculated
ASSESSMENT ||--o{ REPORT_SNAPSHOT : reported
REPORT_SNAPSHOT }o--o{ BENCHMARK_VALUE : compared
ASSESSMENT ||--o{ QUALITY_FLAG : flags
Entities
Project / Building
Project and building with use, work type, typology, structural system, exemption basis and whether an energy performance certificate is required.
country, municipality, permitApplicationDate, uses[share], workType, typology, structuralSystem, internalVolume_m3, uprn, mainMaterials, deliveryScope, exemptionBasis
AreaMeasurement
Several areas per building. Intensities are derived, never stored on their own.
areaType: BTA | Atemp | GIA | GEA | GFA | useful_floor_area | yard_area …, value_m2, standard
MethodProfile
Configuration per method and version. A new version becomes a new record.
rspYears, requiredModules, headlineIndicator, biogenicRule, areaType, elementScope, adjustments, dataHierarchy, limitValues
Assessment
One assessment per building, stage and version.
methodProfile, designStage (RIBA / SE / RICS), assessmentType, dateOfCommencement, scopeType, uncertainty{contingency, carbonData, quantity, confidenceScore, QUL}, verification{outcome, deliverables, rounds[queries], summaryReport}, portfolioInclusion[], registration
Element
Hierarchical BoQ line with classifications and quantity source.
parentId, quantity, unit, quantityBasis, quantitySource, classifications[], neutralPart, esl_years, cost
MaterialLine
Material line with raw name, conversion, dataset, scenarios and quality score.
materialNameRaw, quantity, conversion{factor,source}, mass_kg, datasetId, wasteFactor, top10, dataQuality{geographical, technological, productSpecificity, temporal, granularity, verification, confidenceScore, qul}, spec{strengthClass, cementType, scmShare, reinforcementType, reinforcement_kg}, substitution{basis, declared}
Dataset
EPD, generic, CPR or proxy in one table with a subtype.
type, externalIds, standard (A1/A2), lciaMethod, declaredUnit, validUntil, materialProperties, boverket{typical,conservative}
IndicatorValue
Long table. Distinguishes between zero, not declared and not relevant.
datasetId, module, scenario, indicator, value, status, derived
Scenario
Typed, reusable assumptions with a source.
transport_A4 | waste_A5 | site_energy_A5 | replacement_B4 | operational_B6 | eol_C | module_D
Adjustment
Explicit uplifts that can be removed or swapped.
coverage_uplift | conservative_factor | rics_phase_contingency | rics_*_uncertainty | client_top_up
Classification
Codes in many systems and the mappings between them.
RICS_WLCA_V2, NRM1_approx, CLIENT_*, SE_KD_PART, COCLASS, LEVELS, NEUTRAL; relation, share, confidence
Result / ReportSnapshot
Calculated results can be redone; reports are locked with a scope fingerprint.
scope{methodProfile, modules, indicator, normalisationUnit (m² BTA | m² GIA | m² useful | m³), scenario, partsIncluded, adjustments}, total, intensity, coverage, hash
Quality flags (starter list)
| Code | Rule |
|---|---|
| MATERIAL_DISAPPEARED | GWP > 0 but no reportable building part in the profile |
| CLASSIFICATION_NOT_ROLLED_UP | Level 3 code that does not match level 2 |
| MISSING_QUANTITY | Quantity 0 or missing with a dataset selected |
| UNIT_MISMATCH | The line's unit cannot be converted to the dataset's |
| EPD_EXPIRED | The EPD expired before the assessment date |
| EPD_A1_IN_A2_PROFILE | +A1 data where the profile requires +A2 |
| GWP_GHG_DERIVED | GWP-GHG derived from total minus biogenic |
| A4_FROM_EPD_SE | A4 from an EPD in a Swedish profile |
| NON_CONSERVATIVE_GENERIC_SE | Typical instead of conservative Boverket value |
| COVERAGE_BELOW_MIN | Coverage below the profile's minimum |
| QUALITY_SCORE_DEFAULTED | Data quality left at the tool's maximum value |
| MODULE_CODE_COLLISION | A5.1 without a system (Boverket waste or RICS demolition?) |
| MISSING_VOLUME_STORAGE | Storage building without internal volume |
| MISSING_DECARBONISED_SCENARIO | RICS requires both scenarios |
| SCOPE_MISMATCH_BENCHMARK | Benchmark and result have different scope |
| EPD_NOT_VALID_AT_COMPLETION | EPD expired before practical completion |
| SUBSTITUTION_NOT_DECLARED | Generic or equivalent-product dataset used without being declared |
| PROCUREMENT_EVIDENCE_MISSING | A top-10 product is supported only by the EPD itself, not by an order, delivery note or invoice |
| SPEC_DATASET_MISMATCH | Specification and dataset disagree, e.g. a steel-fibre slab modelled with rebar, or a concrete grade or SCM share that differs from the EPD |
| QUANTITY_SOURCE_CONFLICT | BIM, drawings, specification and delivery notes give different quantities for the same part |
| MODEL_WRONG_PLOT | A source model belongs to another plot or building |
| PART_COMPLETENESS_LOW | A building part is far thinner than in comparable buildings of the same typology |
| TOOL_NOT_RECOGNISED | The calculation tool is not recognised by the scheme being reported, e.g. BREEAM Mat 01 |
Verification, portfolio metrics and restatement
- Verification is a loop. The assessor sends a results template, the BIM model, drawings and a cost plan; the verifier returns queries per part or material; the assessor answers and updates until the verifier signs off or concludes that the assessment cannot be verified. The model stores the deliverables, each round of queries and responses, the outcome and the summary report. Continental verifications are often done without drawings, which is why the deliverables list matters.
- Quantities need a source order. Each part keeps which source gave the quantity (BIM, drawings, specification, cost plan, delivery notes, procurement) and the evidence behind it. Conflicts and double counting across models are flagged, not silently resolved.
- Specifications are checked against datasets. Strength class, cement type, SCM share, reinforcement type and amount are stored per line, so a steel-fibre slab modelled with rebar, or a CEM III mix modelled with a CEM I EPD, shows up.
- Completeness per part. Comparing each part with buildings of the same typology shows where an assessment is likely incomplete.
- Portfolio metrics are aggregates. An owner's annual target is typically total kg CO2e of all included buildings divided by their total area. Buildings with non-standard elements, such as a cold store, can be excluded or have those elements split out; the decision is stored per metric and year.
- Restatement. When emission factors or methods change, earlier years are recalculated as new snapshots while the original figures stay reproducible.
Calculation flow
for each material line: 1. roll up classification → neutral building part → in the profile's scope? 2. convert quantity to the dataset's declared unit (stored conversion) 3. choose indicator per profile (GWP_GHG or GWP_total), flag if missing 4. A1-A3 = quantity × value [SE: conservative value if generic] 5. A4: SE climate database transport legs; RICS table 17 with 43% empty running 6. A5 waste: SE (waste factor − 1) × (A1-A3 + A4); RICS rate × (A1-A3 + A4 + C) 7. B4 = (A1-A3 + A4 + A5 + C) × number of replacements(RSP, ESL) [if the profile requires B] 8. C1-C4, D1, D2 from dataset or scenario at assessment level: 9. A5 energy measured (SE) or 40 kg/m² GIA (RICS); demolition 35 kg/m² demolished GIA 10. uplifts in the profile's order: coverage, contingency, uncertainty, top-up 11. aggregate per module group and building part 12. normalise (m² BTA / m² GIA / m³ / m² useful), both scenarios → ReportSnapshot
Re-reporting means running the steps again with a different profile. Hard incompatibilities are flagged instead of being silently converted: +A1 data in a +A2 profile, EPDs without C and D, GWP-GHG where GWP-total is required, imported totals that cannot be broken down, different area standards.
The current project-lca.schema.json is kept as a flat report view for the first client, so the app is not affected.
12Populating on an ongoing basis
| Step | What | Source | Frequency |
|---|---|---|---|
| 1 | Reference data: modules, indicators, method profiles, building-part crosswalk, benchmarks | data/schemas/reference/ | On rule changes |
| 2 | Generic datasets: Boverket 02.07.000 (230 entries), ICE, the OneClick catalogue (545) | Boverket API, download | Annually |
| 3 | EPDs: ILCD+EPD, openEPD, PDF as a last resort | Environdec, ÖKOBAUDAT, ECO Portal, EC3 | Ongoing |
| 4 | Assessments: OneClick exports, client templates in Excel, BM-XML, IFC | Import | Per project |
| 5 | Benchmarks: UKNZCBS, Boverket, FR, NL, DK, FI, LETI, RIBA, GLA, BECD; the client's own in the client layer | Manual | Annually |
| 6 | Mappings: material name → dataset, category → building part | Rules + review | Ongoing |
- Always import the raw line first, then normalise. Store the source file and line number.
- A new method version becomes a new profile; old reports must remain reproducible.
- A new database version becomes new datasets; the old ones are kept.
- Mappings have a confidence and an author, so manual decisions can be reused.
- Flags are created on import and follow the line until they are resolved.
13Validation and client layer
The model was tested against real data from a first client, a European logistics portfolio: 306 OneClick exports with content, the verifier's report template and method, and a complete BIM project (12 IFC models, quantity take-offs, three OneClick designs). Client data is kept outside the repo. Method and lessons: docs/LCA_VALIDATION.md.
What held
- The chain project → building → assessment → building part → material line → dataset/result → report carried both the portfolio and a BIM project with 37,675 building parts.
- The line totals match the tool's own module totals in 306 of 306 files. Recalculation per method profile works at line level.
- BIM quantities match the LCA tool for the large items (ground slab and steel within 1%).
What broke and has been fixed
| Problem | Fix |
|---|---|
| Only 1 of 323 packages validated (the declared unit is always missing in the export), while the schema let free text through | Optional unit with status; strict entities; modules, indicators and profiles as enumerated values |
| The classification only knew RICS v2 | source-labels.json: code system chosen by tool; tables for the older tree, v2, BREEAM Mat 01, OneClick Question |
| Tools were treated as method profiles | Assessment.sourceTool; the method profile is the calculation method |
| Sequestration and balancing rows had no place | Result.component |
| BIM: the same ground slab in four models, placeholder layers as solid volumes, no place for volume | SourceModel, inventoryRole, quantity semantics, VolumeMeasurement |
| The client's method sat in the market data | Client layer: CLIENT_* profiles and a client column in projects/<tenant>/reference-data/client-profile.json |
The portfolio by method (kg CO2e/m², median, range for unclear building parts)
| Profile | P25 | Median | P75 |
|---|---|---|---|
| A1-A5, everything | 248 | 303 | 365 |
| UKNZCBS upfront scope | 187-232 | 245-275 | 291-328 |
| SE 2030 limit-value scope | 176-245 | 227-301 | 273-357 |
| EU A-C | 222-268 | 282-332 | 352-386 |
The client layer
Property owners and verifiers often have their own methods: a selection of building parts, their own area (often lettable area), their own uplifts and an Excel template. These sit in a client layer on top of the market model, never in it. An assessment has one calculation method and a list of evaluated profiles that can mix market profiles (UKNZCBS, SE 2030, EU) and client profiles. The first client's entire method could be expressed in this way, with no changes to the core schema.
Lesson for all client methods. The classification determines the client figure: a template that reads RICS v2 codes loses 14-15% of the carbon from tools that use the older RICS tree, unless it is recoded. Validation should therefore happen in the model, before the template.
14Regulatory radar
What applies and what is coming in the UK, Sweden and the EU, ordered by your market lens, and whether the model can handle it. Future regulations are held as profiles marked horizon and must be verified against the primary text before they are used for compliance. Details: docs/LCA_REGULATORY_RADAR.md.
Two findings beyond the regulations. Portfolios change owner and method through acquisitions; client methods therefore sit in their own layer, and ownership has validity dates. The ICE database may not be used commercially after 30 September 2026, so emission factors taken from it need another licensed source.
UK
| When | What | The model |
|---|---|---|
| Now | No legal requirement; RICS v2 and UKNZCBS V1 apply; the government rejected mandatory assessments in March 2026 | Yes |
| 17 Aug 2026 | NPPF 2026: local authorities will probably be allowed to set quantitative requirements | Yes, local authority profile template |
| 2027-28 | London Plan GHR3: limits for residential and offices; storage and industrial must reduce and report | Yes, draft profile |
| 1 Jan 2027 | UK CBAM (steel, cement, aluminium); UK SRS for listed companies | Yes, CBAM data and corporate reporting |
| 2027-28 | Possible RICS 3rd edition aligned with EN 15978:2026 (not announced) | Prepared |
| 2029+ | Possible requirement along the lines of Part Z (no commitment) | Stub |
Sweden
| When | What | The model |
|---|---|---|
| 23 Oct 2026 | The consultation period for Boverket's proposal closes | Monitor |
| 1 Apr 2027 | The climate declaration ends (proposal); no national requirement until 2028 | Yes, regime by date of building permit application |
| 1 Jan 2028 | Life-cycle GWP above 1,000 m² | Yes |
| 1 Jan 2030 | Limit values, halls for logistics and retail 190 kg/m² BTA | Yes |
| Now | Municipal requirements (project by project in markanvisning (land allocation), e.g. Gothenburg, Helsingborg, Stockholm, Uppsala), LFM30; Miljöbyggnad, NollCO2, Upphandlingsmyndigheten (the National Agency for Public Procurement) | Yes, profiles; SBEF codes missing |
The EU and member states
| Country | Limit values | The model |
|---|---|---|
| France | RE2020 Ic construction 2025: small houses 530, multi-dwelling buildings 650, offices 810, schools 770 kg/m²; steps in 2028 and 2031. Industrial and logistics covered from 1 May 2026, value not found web | Profile, area SREF, limits in benchmarks |
| Netherlands | MPG from 1 Jul 2026: residential 1.60, offices 1.55, other functions 1.85 €/m² BVO/yr; WLC-GWP 2028, limits 2030 web | Profile, indicator MKI |
| Germany | GModG §88b: life-cycle GWP from 2028, no limits; QNG residential 24/20 kg/m² NRF/yr (voluntary) | Profile |
| Denmark | BR18 from 1 Jul 2025: 6.7 small houses, 7.5 multi-dwelling/office/retail/storage, 8.0 other, A4-A5 max 1.5 kg/m²/yr | Profile plus limit values |
| Finland | From 9 Jan 2026: 16 multi-dwelling buildings to 29 hospitals kg/m²/yr; small houses exempt; tightened in 2029 | Profile plus limit values |
| Norway | Proposed limit values (consultation 2026), industry exempt | Stub |
| Belgium, Ireland, Italy, Spain, Poland, Czechia | No national limit values per type found; EPBD reporting from 2028 | EU profile |
| EU | CPR: GWP per product family (cement around 2027); EN 15978:2026; roadmaps 1 Jan 2027 | Yes, CPR declaration, product passport, standard edition |
Why the model can handle new rules
- Every regulation is a versioned profile, and limit values are data (category × year × value × status).
- All areas are stored in parallel (BTA, ljus BTA (above-ground BTA), Atemp, GIA, NLA, useful floor area, SREF, BVO, NRF, volume) and the profile chooses the denominator.
- Both GWP variants plus MKI, RE2020 Ic and CML; modules according to EN 15978:2026.
- Trigger dates determine the regime; product data from CPR, product passports and CBAM is kept separate from EPDs; licence status per dataset.
- Corporate reporting and change of ownership (Scope 3 category, year, ownership share).
15Open questions
| # | Question | Where the answer is |
|---|---|---|
| 1 | Which modules are scaled up with the coverage in today's climate declaration | Boverket's guidance |
| 2 | Are load-bearing piles "markförstärkning" (ground reinforcement) in SE 2030? Are dock ramps operation-related? | Boverket, consultation responses |
| 3 | Definition of "industribyggnad" (industrial building) | Forthcoming regulations |
| 4 | Where does special housing (specialbostäder) fall in SE 2030, and does the 130 m² threshold refer to usable floor area or Atemp? | Boverket |
| 5 | Two different reference values for preschool and school in Boverket 2026:16 (tables 9 and 11) | Boverket |
| 6 | FR RE2020: thresholds for industry, logistics and other tertiaire spécifique | Arrêté 19 mars 2026 |
| 7 | Solar PV limit 1,000 or 750; retrofit values that differ between the standard and the template | UKNZCBS |
| 8 | The content of EN 15978:2026; CPR dates per product family; national roadmaps under the EPBD (1 Jan 2027) | Regulatory radar |
| 9 | Consultation outcome for Boverket 2026:16 | The Government |
| 10 | What OneClick's project card (kg/m², rating) measures; it cannot be recreated from the export | OneClick |
| 11 | BREEAM V7 Mat 01: is an as-built LCA mandatory, does it follow RICS WLCA v2 in full, and which element scope applies? | BREEAM V7 manual, GN51 |
| 12 | How a new LCA tool becomes BREEAM-recognised (process, criteria, time) | BRE, KBCN1118 |
| 13 | DGNB 2023 ENV1.1 and QNG: modules, study period, area basis and reference values for logistics | DGNB, QNG |
16Glossary and sources
| Swedish | English | Explanation |
|---|---|---|
| BTA (bruttoarea) | Gross area | To the outside of the external walls, SS 21054 |
| Atemp | Heated floor area | Temperature-controlled area, for energy |
| GIA | Gross internal area | To the inside of the external walls, RICS |
| Inre volym | Internal building volume | RICS normalisation for storage |
| Markförstärkning | Ground reinforcement | Piles, stabilisation |
| Byggstart | Date of commencement | UKNZCBS limit year |
| Mängdförteckning | Bill of quantities | List of quantities |
| Byggdel | Building element | Functional part: wall, roof, foundation |
| Klimatskärm | Building envelope | Roof, external walls, foundation, windows, doors |
| Installationer | Services / MEP | Heating and plumbing, electrical, ventilation |
| Ytskikt | Finishes | Paint, floor covering, wallpaper |
| Byggspill | Construction waste | Material that becomes waste on site |
| Täckningsgrad | Coverage | Share of products with climate data |
| Byggherre | Developer / client | The party that has the building built |
| Slutbesked | Completion certificate | Permission to take the building into use |
| Referensstudieperiod | Reference study period | The assessment's time period |
| Uppskattad livslängd | Estimated service life | Drives replacements in B4 |
| Påslag | Contingency / uplift / top-up | Addition for incomplete design or data |